The Republic of the union of myanmar

Ministry Of Electricity And Energy

Breaking News :

Nay Pyi Taw Council


Paunglaung

1

Location

 Zayyarthiri Township, NayPyiTaw Territory

2

Creek

Paunglaung

3

Construction Starting Date

1.2.1997

4

Commercial Running Date

2005

5

Installed Capacity

280 MW (70MW × 4 )

6

Rated Head 

340 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

4 × 2701.75 ft3/s = 10807 ft3/s

9

Annual Design Generation

911 GWh

10

Transmission Line

230 kV Paunglaung – Pyinmana Line (1) & (2) (11) miles

11

Penstock

263 ft (2) Nos (f - 28 ft)

 

Paunglaung

Upper Paunglaung

1

Location

 (26) Miles East of Pyinmana Township, Naypyitaw Territory

2

Creek

Paunglaung

3

Rated Head 

260 ft

4

Type of Turbine 

Francis (Vertical)

5

Installed Capacity

140 MW (70MW × 2 )

6

Annual Design Generation

454 GWh

Paunglaung

 

 

 

Nan Cho

1

Location

(16)Miles East of Pyinmana Township, NayPyiTaw Territory

2

Creek

Nan Cho

3

Construction Starting Date

2006

4

Commercial Running Date

11.4.2014

5

Installed Capacity

40 MW (20 MW × 2)

6

Rated Head 

328 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

1674 ft3/ Sec

9

Annual Design Generation

152 GWh

10

Transmission Line

230kV, Nancho-Paunglaung (7.6) miles

230kV,  Nancho -Upper Paunglaung

11

Penstock

263 ft (2) Nos (f - 28 ft)

Nan Cho