Yangon Division


Hlawga Thermal Power Plant

1

Location

Mingaladon Township, Yangon

2

Commercial Running Date

5.11.1995  (Machine-1 Turbine)

19.1.1996 (Machine-2 Turbine)

23.2.1996 (Machine-3 Turbine)

30.4.1999 (Steam Turbine)

3

Total Installed Capacity

154.2  MW

 (99.9 MW (3× 33.3 MW) +

 54.3 MW )

4

Type of Turbine 

 (G.E Frame -6 Gas Turbine)(3 sets)

 (ABB, V-63 Steam Turbine)(1set)

Hlawga


Ywama

1

Location

Insein Township, Yangon  Region

2

Commercial Running Date

7.3.1980 (JOHN BROWN -I)

3.4.1980 (JOHN BROWN -II)

24.8.2004  (Hitachi H-25 )

8.10.2004  (Shin Nippon )

22.5.2014 (Mitsubishi – I)

30.3.2014 (Mitsubishi – II)

3

Total Installed Capacity

310.3 MW

4

Installed Capacity

- 36.9MW (2× 18.45 MW) (JOHN BROWN )

 - 24 MW (Hitachi H-25 )

 - 9.4 MW (Shin Nippon )

 - 240 MW ( 2×120 MW)(Mitsubishi )

5

Type of Turbine 

 

 (JOHN BROWN )(2 sets)

 (Hitachi H-25 )(1 set)

 (Shin Nippon )(1 set)

Mitsubishi )(2 sets)

Ywama


Thaketa

1

Location

Thaketa Township, Yangon  Region

2

Commercial Running Date

5.2.1990 (Machine-1 Turbine)

11.4.1990 (Machine-2 Turbine)

22.3.1990 Machine-2 Turbine)

1.2.1997 (Steam Turbine)

3

Total Installed Capacity

92 MW

4

Installed Capacity

57 MW (3× 19 MW) (Gas Turbine)

35MW (Steam Turbine)

5

Type of Turbine 

 

 (Gas Turbine) (3 sets)

 (Steam Turbine) (1 set)

Thaketa


Ahlone

1

Location

Ahlone Township, Yangon  Region

2

Commercial Running Date

16.2.1995 (Machine-1 Turbine)

11.4.1995 (Machine-2 Turbine)

1.6.1999 (Machine-2 Turbine)

10.9.1999  (Steam Turbine)

3

Total Installed Capacity

154.2 MW

4

Installed Capacity

99.9 MW (3× 33.3 MW) (Gas Turbine)

54.3 MW (Steam Turbine)

5

Type of Turbine 

 

 GE Frame 6 - Gas Turbine  (3 sets)

 ABB V 63 - Steam Turbine (1 set)

Ahlone


Thilawa Thermal Power Plant 

1

Location

Thilawa  Special Economic Zone, Yangon Region

2

Commercial Running Date

25.5.2016  (Machine-1 Turbine)

23.8.2016(Machine-2 Turbine)

3

Total Installed Capacity

50 MW

4

Installed Capacity

(2× 25 MW) (Gas Turbine)

5

Type of Turbine 

 Hitachi  H 25 Gas Turbine ( 2 Sets)

6

Manufactured Company

Hitachi  / Japan

7

Used of Natural Gas

15 MMCFD

Thilawa


Hlawga Thermal Power Plant  (IPP/ BOT)

1

Location

Thaketa Township, Yangon Region

2

Company Name

Myanmar Central  Power  Co., Ltd

3

Project Type

IPP/ BOT

4

Commercial Running Date

22.5.2013 (Phase I)

1.10.2015  (Phase II)

5

Total Installed Capacity

50 MW

6

Installed Capacity

(26×1.025MW=26.65 MW) ( Phase I)

(3× 9.2MW=27.56MW) (Phase II)

7

Type of Turbine 

 SFGM 560 ( Phase I)

Rolls-Royce Gas Engine (Phase II)

8

Manufactured Company

Guascor (Dresser-Rand) / Spain

Rolls-Royce / England

9

Annual Design Generation

357 GWh

10

Used of Natural Gas

8.64 MMCF/Day ( Phase I)

7.9   MMCF/Day (Phase II)

Hlawga

 


Ywama Thermal Power Plant  (IPP/ BOT)

1

Location

Insein Township, Yangon Region

2

Company Name

UPP Holding & Myanshwepyi  Co., Ltd

3

Project Type

IPP/ BOT

4

Commercial Running Date

11.2.2014

5

Total Installed Capacity

52MW

6

Installed Capacity

(1.025 MW ×26)

(9.2 MW × 3)

7

Type of Turbine 

 Caterpillar Gas Engine

8

Manufactured Company

Caterpillar / Germany

9

Annual Design Generation

437.5 GWh

10

Used of Natural Gas

16.5723 MMCF/Day ( Phase I)

Ywama


Thaketa Thermal Power Plant  (IPP)

1

Location

Thaketa Township, Yangon Region

2

Company Name

Max Power  Pte.,Ltd

3

Project Type

BOT

4

Commercial Running Date

23.8.2013

5

Total Installed Capacity

50 MW

6

Installed Capacity

(16× 3.352 MW)

7

Type of Turbine 

 GE Gas Engine GMS-620J-F111

8

Manufactured Company

Australia

9

Annual Design Generation

437.5 GWh

10

Used of Natural Gas

16.5723 MMCF/Day ( Phase I)

Thaketa


Alone Thermal Power Plant  (IPP)

1

Location

Alone Township, Yangon Region

2

Company Name

Toyo Thai Myanmar Power Co., Ltd

3

Project Type

BOT

4

Commercial Running Date

15.5.2013

5

Total Installed Capacity

121  MW

6

Installed Capacity

(2×47 MW= 94  MW) (Gas Turbine ) (Phase I)

27MW (Phase II) (Steam Turbine) ( Phase II)

7

Type of Turbine 

 GE  Aeroderivative Gas Turbine  LM  6000  PC ( Phase I )

Mitsui-Alstom Steam Turbine

8

Manufactured Company

GE / Hungary (Phase I)

MITSUI / Japan ( Phase II)

9

Annual Design Generation

1051.2 GWh

Alone