1 |
Location |
− |
Satotaya Township, Magway Region |
2 |
River |
− |
Mone |
3 |
Construction Starting Date |
− |
1997~1998 |
4 |
Commercial Running Date |
− |
2004 |
5 |
Installed Capacity |
− |
75 MW (3 × 25 MW) |
6 |
Rated Head |
− |
124.68 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
3 × 2010 ft3/s = 6030 ft3/s |
9 |
Annual Design Generation |
− |
330 GWh |
10 |
Transmission Line |
− |
132 kV Mone-Chauk Line (61) miles |
11 |
Penstock |
− |
450 ft (f - 13.9 ft) |
1 |
Location |
− |
Pwint Phu Township, Magway Region |
2 |
Creek |
− |
Mone |
3 |
Construction Starting Date |
− |
2002-2003 |
4 |
Commercial Running Date |
− |
2012 |
5 |
Installed Capacity |
− |
74 MW (2 × 37 MW) |
6 |
Rated Head |
− |
112.5 ft |
7 |
Type of Turbine |
− |
Kaplan (Vertical) |
8 |
Discharge |
− |
2 × 2148 ft3/s = 4296 ft3/s |
9 |
Annual Design Generation |
− |
370 GWh |
10 |
Transmission Line |
− |
132 kV Minbu Line (43) miles |
11 |
Penstock |
− |
No (1) - 853 ft No (2) - 914 ft (f -18 ft) |
1 |
Location |
− |
Gangaw Township, Magway Region |
2 |
River |
− |
Myitthar |
3 |
Construction Starting Date |
− |
2002-2003 |
4 |
Commercial Running Date |
− |
9.1.2017 |
5 |
Installed Capacity |
− |
40 MW (2 × 20 MW) |
6 |
Rated Head |
− |
74 ft |
7 |
Type of Turbine |
− |
Kaplan (Vertical) |
8 |
Discharge |
− |
2754 ft3/ Sec |
9 |
Annual Design Generation |
− |
170 GWh |
10 |
Transmission Line |
− |
66 kV(MyitThar- Gangaw) (14.9) miles Double Circuit |
1 |
Location |
− |
Pakautku Township, Magwe Region |
2 |
Commercial Running Date |
− |
11.3.1974 (Machine -1) 20.3.1974 (Machine-2) 4.6.1974 (Machine -3) |
3 |
Total Installed Capacity |
− |
54.30 MW (3 × 18.1MW) |
4 |
Type of Machine |
− |
JOHN BROWN Mark-I, Frame-5 Gas Turbine |
5 |
Construction Cost |
− |
MMK - 61.6 million |
1 |
Location |
− |
Minbu Township, Magwe Region |
2 |
Commercial Running Date |
− |
22.8.1980 (Machine -1) 8.12.1980 (Machine-2) |
3 |
Total Installed Capacity |
− |
36.90 MW (2× 18.45 MW) |
4 |
Type of Machine |
− |
GE Frame 5 (Industrial Outdoor Package Type) |
5 |
Construction Cost |
− |
MMK - 134.6 million |