The Republic of the union of myanmar

Ministry Of Electricity And Energy

Breaking News :

Bago Division


Zaungtu

1

Location

Bago Township, Bago Region

2

River

Bago

3

Construction Starting Date

1.1.1994

4

Commercial Running Date

2000

5

Installed Capacity

20 MW (2 × 10 MW)

6

Rated Head 

89.9 ft

7

Type of Turbine 

Kaplan (Vertical)

8

Discharge

2 × 1539 ft3/s = 3078 ft3/s

9

Annual Design Generation

76 GWh

10

Transmission Line

66 kV Zaungtu-Kamanat Line (45.6) miles

11

Penstock

672 ft  (2) Nos (f - 16.4 ft)

Zaungtu


Yenwe

1

Location

Kyauktaga Township, Bago Region

2

Creek

Yenwe

3

Construction Starting Date

2001

4

Commercial Running Date

2007

5

Installed Capacity

25 MW (2 × 12.5 MW)

6

Rated Head 

187 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

2 × 883 ft3/s = 1766 ft3/s

9

Annual Design Generation

123 GWh

10

Transmission Line

33 kV Yenwe-Thayagone Line 1) & (2) (18.5) miles

11 kV Dam Line  (13.5) miles

11

Penstock

508 ft (f - 18 ft)

Yenwe


Kabaung

1

Location

 Oaktwin Township, Bago Region

2

Creek

Kabaung

3

Construction Starting Date

2002-2003

4

Commercial Running Date

2008

5

Installed Capacity

30 MW (2 × 15 MW)

6

Rated Head 

152 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

2 × 1395 ft3/s = 1766 ft3/s

9

Annual Design Generation

120 GWh

10

Transmission Line

33 kV Kabaung-Taung Oo Line (1) & (2) (15) miles

11

Penstock

210 ft (f - 21 ft)

 

     Kabaung


Shwegyin

1

Location

 Shwegyin Township, Bago Region

2

Creek

Shwegyin

3

Construction Starting Date

2002-2003

4

Commercial Running Date

2011

5

Installed Capacity

75 MW (4 × 18.75 MW)

6

Rated Head 

135.8 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

4 × 1900 ft3/s = 7600 ft3/s

9

Annual Design Generation

262 GWh

10

Transmission Line

230 kV Thayagone Line miles (25) miles 11 kV Madauk Line (11) miles

11

Penstock

1100 ft , (2) Lines (f - 25 ft)

Shwegyin


Kun Chaung

1

Location

 Phyu Township, Bago Region

2

Creek

Kun

3

Construction Starting Date

2002-2003

4

Commercial Running Date

2012

5

Installed Capacity

60 MW (3 × 20 MW)

6

Rated Head 

347 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

3 × 777 ft3/s = 2331 ft3/s

9

Annual Design Generation

190 GWh

10

Transmission Line

230 kV Kun-Taungoo Line (37.304) miles

230 kV Kun-Thayagone Line (30.82) miles

11

Penstock

1295 ft  (f - 15 ft)

Kun Chaung


Thauk Ye Khat No. (2)

1

Location

 Taungoo Township, Bago Region

2

Creek

Thauk Ye Khat

3

Construction Starting Date

2007-2008

4

Commercial Running Date

2013

5

Installed Capacity

120 MW (3 × 40 MW)

6

Rated Head 

269 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

3 × 2489.3 ft3/s = 7468 ft3/s

9

Annual Design Generation

604 GWh

10

Transmission Line

230 kV Taungoo Line (13.09) miles

11

Penstock

1972 ft f - 28 ft, (1) No

Thauk Ye Khat No. (2)


Phyu Chaung

 

1

Location

 (7) miles West of Phyu Township, Bago Region

2

Creek

Phyu

3

Installed Capacity

40 MW (2 × 20 MW)

4

Rated Head 

337 ft

5

Type of Turbine 

Francis (Vertical)

6

Annual Design Generation

120  GWh

Phyu Chaung


ShweTaung

1

Location

Shwe Taung Township, Bago Region(Western)

2

Commercial Running Date

16.2.1982  (Machine -1)

5.6.1982 (Machine-2)

16.4.1984 (Machine -3)

3

Total Installed Capacity

55.35 MW (3 × 18.45 MW)

4

Type of Machine 

 Gas Turbine  GE Frame 5

(JOHN BROWN  Co., Ltd )

ShweTaung