The Republic of the union of myanmar

Ministry Of Electricity And Energy

Breaking News :

Kachin State


Dapein No. (1)

1

Location

Bhamaw Township, Kachine State

2

River

Dapein

3

Construction Starting Date

2007-2008

4

Commercial Running Date

2011

5

Installed Capacity

240 MW (4 × 60 MW)

6

Rated Head 

225 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

4 × 3407.75 ft3/s = 13631 ft3/s

9

Annual Design Generation

1065 GWh

10

Transmission Line

110 kV Dapein-Bhamaw (23) miles

500 kV Dapein (1) - Daying Jing Stage-4 (1.5) miles

11

Penstock

1010 ft × (4) Nos (f -16 ft)

Dapein No. (1)


Chipwinge

1

Location

Chipwinge Township, Kachine State

2

River

Chipwi

3

Construction Starting Date

2013

4

Commercial Running Date

5.4.2008

5

Installed Capacity

99  MW (3 × 33 MW)

6

Rated Head 

1421 ft

7

Type of Turbine 

Vertical , Pelton

8

Discharge

311.52 ft3/s

9

Annual Design Generation

599 GWh

10

Transmission Line

110 kV (13.09 miles) Chipwinge - Winemaw line

11

Penstock

8.66 ft × 12.80 ft 

Chipwinge