The Republic of the union of myanmar

Ministry Of Electricity And Energy

Breaking News :

Kayah State


Baluchaung No. (1)

1

Location

Loikaw Township, Kayah State

2

Creek

Baluchaung

3

Construction Starting Date

1987

4

Commercial Running Date

1992

5

Installed Capacity

28 MW (2 × 14 MW)

6

Rated Head 

228.5 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

2 × 840 ft3/s = 1680 ft3/s

9

Annual Design Generation

200 GWh

10

Transmission Line

132 kV BHP (2) Line (9.3) miles

11 kV Loikaw Line (10.5) miles

11 kV Dawtachar Line (5.5) miles

11

Penstock

520.66 ft (f - 12.5 ft ~ 6.9 ft)

ဘီလူးချောင်း ()


Baluchaung No. (2)

 

1

Location

Loikaw Township, Kayah State

2

Creek

Baluchaung

3

Construction Starting Date

1954, Machine - 1, 2, 3

1970, Machine  - 4, 5, 6

4

Commercial Running Date

1960, Machine -1, 2, 3

1974, Machine - 4, 5, 6

5

Installed Capacity

168 MW (6 × 28 MW)

6

Rated Head 

1388 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

6 × 280 ft3/s = 1680 ft3/s

9

Annual Design Generation

1190 GWh

10

Transmission Line

230 kV Lawpita-Taungoo-Hlawga Line (250) miles

132 kV Lawpita-Kalaw-Thazi- Mandalay Line (1) & (2) (225) miles

33 kV Lawpita-Loikaw-Mobye  Line (22.5) miles

33 kV Lawpita-Phekhon Line (33) miles

33 kV Lawpita-Phasaung Line (77) miles

11 kV Lawpita Line (5) miles

11

Penstock

3570 ft (f - 9.3 ft ~ 9 ft)

Baluchaung No. (2)


Baluchaung No. (3)

1

Location

 Loikaw Township, Kayah State

2

Creek

Baluchaung

3

Construction Starting Date

2008

4

Commercial Running Date

22.8.2015

5

Installed Capacity

52 MW (2× 26 MW)

6

Rated Head 

398 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

1800 ft3/s

9

Annual Design Generation

334 GWh

10

Transmission Line

132 kV Lawpita Line (2.9) miles

11

Pipe Line

14141 ft

Baluchaung No. (3)