Renovation Works of the Tharkeyta Power Plant (State Owned)
Project Location |
- |
Yangon Division, in the compound of old Tharkeyta Power Plant
|
Contractor |
- |
Marubeni Power Systems Corporation
|
Project Type |
- |
State Owned The EPC (Engineering, Procurement and Construction) contract was signed by Electric Power Generation Enterprise with the Marubeni Power Systems Corporation in order to renovate the 3 no. of Gas Turbine with the finance of JICA.
|
Machine Type |
- |
GT (Frame-V, Mark- II)
|
Current Capacity |
- |
GT (3 x 19 MW)
|
Renovated capacity |
- |
GT (3 x 21.8MW)
|
Gas Consumption |
- |
27 MMCFD
|
Project Consultant |
- |
Owner's Engineer; Tokyo Electric Power Services Co.,Ltd& Oriental Consultants Co.,Ltd
|
Current Status | - |
Contractor is excuting the renovation works of Gas Turbines and importing the necessary equipment for the renovation.
|
Rehabilitation Works of Transmission System (Ahlone, Hlawaga, Ywama, Tharkeyta)
Project Location |
- |
Yangon Division
|
Contractor |
- |
Mitsubishi Corporation
|
Project Implementation |
- |
The EPC (Engineering, Procurement and Construction) contract was signed by Electric Power Generation Enterprise with the Mitsubishi Corporation in order to rehabilitate the Transmission System of Ahlone, Hlawaga, Ywama and Tharkeyta Sub-Station with the finance of JICA
|
Project Consultant |
- |
Owner's Engineer; Tokyo Electric Power ServicesCo.,Ltd& Oriental Consultants Co.,Ltd
|
Current Status |
- |
Currently EPGE, Consultant and Contractor are reviewing the Engineering Design. And Contractor is importing the equipments from the aboard and implementint the Substation upgrade project.
|
Rehabilitation, Operation, Maintenance and Management (ROMM) of
HlawagaPower Plant (Private Owned)
Project Location |
- |
Yangon Division, in the compound of old Hlawaga Power Plant
|
Company |
- |
Golden Green Energy Co.,Ltd
|
Project Type |
- |
ROMM (Private Owned) The PPA (Power Purchase Agreement) contract was signed by Electric Power Generation Enterprise with the Golden Green Energy Co.,Ltdfor the Rehabilitation, Operation, Maintenance and Management (ROMM) of Hlawaga Power Plant
|
Machine Type |
- |
GT (Frame-6, Mark- V)
|
- |
STG (V63, CS-3000)
|
|
Current Capacity |
- |
70 MW
|
Renovated capacity |
- |
84 MW
|
Gas Consumption |
- |
26 MMCFD
|
Current Status |
- |
Currently contractor is executing the rehabilitation work of Hlawaga Power Plant.
|