Thaton 118.9 MW Combined Cycle Power Plant Project (State Owned)
Project Location |
- |
Mon State, ThatonDistrict, in the compound of old Thaton power plant
|
Contractor |
- |
China Energy Engineering Group Co.,Ltd (CEEC)
|
Project Type |
- |
State Owned The EPC (Engineering, Procurement and Construction) contract was signed by Electric Power Generation Enterprise with China Energy Engineering Group Co.,Ltd dated on (26.1.2016) in order to implement the Thaton 118.9 MW CCGT Power Plant with the finance of World Bank.
|
Machine Type |
- |
GT (GE 6F.01, France), STG (India)
|
Plant Configuration |
- |
2 GT x 2 HRSG x 1 STG
|
Installed Capacity |
- |
GT (2 x 46MW), STG (1 x 44MW)
|
Contracted Capacity |
- |
118.9 MW
|
Gas Consumption |
- |
20 MMCFD (Zawtikaoffshore Natural Gas)
|
Project Consultant |
- |
Owner's Engineer; Tractebel Engineering S.A., Belgium ESIA Consultant; Fichtner GmbH &Co.,KG, Germany
|
Current Status | - |
Currently performing the commissioning works of Gas Turbine and Steam Turbine
|
(b) Completion of No.2 Gas Turbine and generator