The Republic of the union of myanmar

Ministry Of Electricity And Energy

Breaking News :

KACHIN STATE


EPGE

Dapein No. (1)

1

Location

Bhamaw Township, Kachine State

2

River

Dapein

3

Construction Starting Date

2007-2008

4

Commercial Running Date

2011

5

Installed Capacity

240 MW (4 × 60 MW)

6

Rated Head 

225 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

4 × 3407.75 ft3/s = 13631 ft3/s

9

Annual Design Generation

1065 GWh

10

Transmission Line

110 kV Dapein-Bhamaw (23) miles

500 kV Dapein (1) - Daying Jing Stage-4 (1.5) miles

11

Penstock

1010 ft × (4) Nos (f -16 ft)

Dapein No. (1)


Chipwinge

1

Location

Chipwinge Township, Kachine State

2

River

Chipwi

3

Construction Starting Date

2013

4

Commercial Running Date

5.4.2008

5

Installed Capacity

99  MW (3 × 33 MW)

6

Rated Head 

1421 ft

7

Type of Turbine 

Vertical , Pelton

8

Discharge

311.52 ft3/s

9

Annual Design Generation

599 GWh

10

Transmission Line

110 kV (13.09 miles) Chipwinge - Winemaw line

11

Penstock

8.66 ft × 12.80 ft 

Chipwinge

 


DPTSC

230 kV Transmission Line(2018, February)

Kachin State

Sr.

Name of Transmission Line

Conductor

Size

Distance

(Mile)

Number

of Tower

1

132 kV Tapin (1) - Bamaw

397.5 MCM

22.79

132

2

132 kV Warshaung - Winemaw

397.5MCM

10.38

66

 


66 kV Transmission Line (2018, February)

Kachin State

Sr.

Name of Transmission Line

Conductor

Size

Distance

(Mile)

Number

of Tower

1

66 kV Kyaukphahtoe – Shwegu - Bamaw

185 sqmm

153.97

2226

2

66 kV Bamaw - Myothit

795 MCM

25.07

435

3

66 kV Myothit – Doc Pon Yang

795 MCM

20.07

358

4

66 kV Nabar - Moenyin

795 MCM

41.47

782

5

66 kV Moenyin - Moekaung

795 MCM

57.89

1042

6

66 kV Moekaung – Myitkyinar (2)

795 MCM

42.04

595

7

66 kV Myitkyinar (2)- Myitkyinar (3)

795 MCM

8.97

214

8

66 kV Myitkyinar (1)- Myitkyinar (3)

795 MCM

3.22

64

9

66 kV Winemaw – Myitkyinar (1)

795 MCM

5.30

132

 


132 kV Primary Substation (Kachin State)

No

Substation

Voltage ratio

(kV)

Capacity

(MVA)

Location

1

Bamaw

132/11

45

Bamaw

 

 

2

Winemaw

132/66/11

60

Winemaw

 

 


1.132 kV Bamaw Primary Substation

1. Location

    Bamaw Township, Bamaw District, Kachin State

2. Area

     (20.39) Acre

3. Commissioning Date

     (18-September-2010)

4. Installed Capacity

     132/11 kV,   45 MVA (Crompton Greave, India)

     Total           45 MVA

5. Transmission Lines and Distribution Feeders

    (A)  132 kV Transmission Lines

               (1) Tapin (1)-Bamaw Line

         

     (B)  11 kV Distribution Feeders

              (1)Bamaw (1) Feeder

              (2) Bamaw (2) Feeder

              (3) Bamaw (3) Feeder

              (4) Moe-maught Feeder      

              (5) Man-se Feeder               

6.  Distribution Regions

     Bamaw, Moe-maught, Man-se, Shwe-ku, Daught-phone-yan


2. 132 kV Winemaw Primary Substation

1. Location

    Winemaw Township, Myitkyinar District, Kachin State

2. Area

(100.28) Acre

3. Commissioning Date

     (28-October -2013)

4. Installed Capacity

    132/66/11 kV,60 MVA (Tira Thai, Thailand)

     Total             60 MVA

 5. Transmission Lines and Distribution Feeders

    (A) 132 kV Transmission Lines

              (1) Che-bwe-nge Factory Line

     (B) 66 kV Distribution Lines

             (1) Myitkyinar (1 ) Line

6. Distribution Regions

    Myitkyinar Township, Moe-kaung Township, Moe-nyin Township


ESE