The Republic of the union of myanmar

Ministry Of Electricity And Energy

Breaking News :

Deputy Minister Dr. Tun Naing for MOEE inspects the distribution status of electricity in Southern Dagon Township, Yangon Region

       

20, January 2018

          Deputy Minister Dr. Tun Naing for  MOEE accompanied by township’s Phithu Hluttaw Representative U Aye Naing, responsible persons of Yangon Regional Hluttaw and Yangon Electricity Supply Corporation inspected Town Office substation, Industrial Zone substation, Innwa substation, Kyansitthar substation, Additional Industrial Zone substation and Ywarthargyi substation for development of electricity distribution in Southern Dagon Township, Yangon Region on 20th January, 2018.

          Currently, above-mentioned 33/11 kV, 35 MVA Town Office substation, 66/11 kV, (20 x 30)MVA Industrial Zone substation, 33/11 kV, 10 MVA  Innwa substation are connected to 230 kV Tharketa substation. Simillary, 66/11 kV, 20 MVA Kyansitthar substatioin, 33/11 kV, (10 x 5) MVA Additional Industrial Zone substation, 33/6.6 kV (5 x 4.5 x 2) MVA Ywarthargyi substation are connected to 230 kV Eastern Dagon Township. (68152) electric consumers and (4) Industrial Zones have been electrified from these substations.

          According to electric power demand, MOEE has tried to construct the additional 11 kV overhead distribution line (1900)ft and (19) Nos of 11/0.4 kV, 200 kVA transformer. And MOEE is managing to install meters in Southern Dagon Township as quick as possible.

          Eventually, Deputy Minister Dr. Tun Naing inspected the situation of voltage and stability of electric power for consumers in Industrial Zone, Southern Dagon Township. 

Post under by : Ministry Office
20-Jan-2018